Project Details

SOLARIZATION OF 252 EXISTING WATER SUPPLY SCHEMES

Project Name

Solarization Of 252 Existing Water Supply Schmes

Client

Public Health Engineering Department, GOB

Consultant

 

Location

Quetta Balochistan

Start Date

Oct 08, 2020

End Date

Oct 07, 2021

Scope of Project

solarization project for existing water supply schemes. This involved conducting thorough assessments to determine the suitability of solarization for each scheme. We identified and procured solar panels, batteries, inverters, and other necessary equipment tailored to the specific requirements of each location. The solar panels were strategically connected in optimal configurations to maximize energy capture. We seamlessly integrated the electrical components with existing water supply infrastructure, ensuring efficient operation. System fine-tuning was carried out meticulously to achieve optimal performance and energy efficiency. Throughout the project, we maintained detailed records of all activities, expenditures, and equipment specifications. A comprehensive maintenance plan was developed to sustain the system’s reliability and longevity. Regular reports were provided to project stakeholders and authorities to ensure transparency and ongoing support.

Our Clients

Our Partners