Implementation of Mushkaf Flood Irrigation Scheme, District Bolan
Project Name
Implementation of Mushkaf Flood Irrigation Scheme, District Bolan
Client
BIWRMDP, Quetta
Consultant
CE – CAMEOS JV & KASIB (SUBCONSULTANT)
Location
Quetta Balochistan
Start Date
Oct 07, 2019
End Date
Sep 21, 2021
Scope of Project
Scope of work for our irrigation project. This involved collaborating closely with engineers and irrigation experts to develop a detailed project plan. Our team designed and implemented water storage reservoirs, diversion structures, and control gates to optimize water management. We installed efficient pumps, pipelines, and control systems to ensure smooth water transport throughout the system. Erosion control measures along canals and channels were effectively implemented to protect infrastructure integrity. Silt traps and sediment basins were installed to prevent sedimentation, maintaining the irrigation system’s efficiency. We developed thorough emergency response plans and a comprehensive maintenance strategy to ensure ongoing operational readiness. Throughout the project, we provided regular reports to project stakeholders and authorities, ensuring transparency and accountability.