Project Name

Package No.5 Lot No.2 Flood Detention Dam Mole-06 (DD/W-M6 ALONG MOLE NAI)

Client

FERP, Irrigation Department Government of Sindh

Consultant

G3 Engineering Consultant Pvt Ltd

Location

Sindh, Pakistan

Start Date

Mar 07, 2023

End Date

Ongoing

Scope of Project

The project scope includes developing engineering designs and plans that consider the area’s topography, hydrology, and geology. All necessary permits and approvals from relevant regulatory authorities will be obtained. The foundation and reservoir area will be excavated according to design specifications. Spillways will be constructed to safely release excess floodwater, with proper sizing and design of spillway and outlet components ensured. Quality control for concrete components will be maintained through proper curing. An early warning system for flood events will be implemented, and safety barriers and warning signs will be erected to restrict access to construction zones. Materials testing and geotechnical assessments will be performed as required. Throughout the project, progress will be monitored, and regular reports will be provided to project stakeholders.

Our Clients

Our Partners