Basol Dam (Package II)
Clients
Irrigation Department Balochistan
City
Ormara
Budget
–
Start Date
2019
End Date
–
Status
Work In Progress


Scope of Work
Construction of a multipurpose dam designed for water storage, irrigation supply, and flood control with complete hydraulic structures including spillway, intake, and outlet works. The project includes development of command area irrigation network, canals, and distribution system for agricultural enhancement. Civil, hydraulic, mechanical, and electrical works are executed under engineering standards ensuring structural safety and durability. Supporting infrastructure such as access roads, buildings, and site development works are included. Environmental protection, slope stabilization, and monitoring systems are integrated. Final testing and commissioning ensure operational readiness.
