The scope of work encompasses developing detailed design plans and specifications for the dam, creating hydraulic models to ensure optimal design, and implementing necessary mitigation measures. It involves identifying potential ecological and social impacts, conducting comprehensive site assessments, and feasibility studies. The work also includes designing and constructing spillways and installing outlet structures for controlled water release. Additionally, it covers the installation of electrical infrastructure, generators, and control systems. Developing emergency response plans and implementing rigorous safety protocols for workers are also integral parts of the project.