Project Details
SOLARIZATION OF 252 EXISTING WATER SUPPLY SCHEMES
Project Name
Solarization Of 252 Existing Water Supply Schmes
Client
Public Health Engineering Department, GOB
Consultant
Location
Quetta Balochistan
Start Date
Oct 08, 2020
End Date
Oct 07, 2021
Scope of Project
solarization project for existing water supply schemes. This involved conducting thorough assessments to determine the suitability of solarization for each scheme. We identified and procured solar panels, batteries, inverters, and other necessary equipment tailored to the specific requirements of each location. The solar panels were strategically connected in optimal configurations to maximize energy capture. We seamlessly integrated the electrical components with existing water supply infrastructure, ensuring efficient operation. System fine-tuning was carried out meticulously to achieve optimal performance and energy efficiency. Throughout the project, we maintained detailed records of all activities, expenditures, and equipment specifications. A comprehensive maintenance plan was developed to sustain the system’s reliability and longevity. Regular reports were provided to project stakeholders and authorities to ensure transparency and ongoing support.